Using task type columns

To enable a quick overview of task information at a higher level, editable task type columns can be added for each task attribute to the task spreadsheet.

New in Studio 4.4 If there are multiple tasks of the same type they will appear as an extra row.

For instance, if you would like to see bids for specific types of tasks at the shot level, you can add the Bid days column (or Bid hours column depending on your configuration) from the Task columns menu for the desired task types.

New in Studio 4.4 If you have many columns of a certain task type it is possible to expand or collapse them. This is a good way to switch between a compact and a detailed way of looking at your tasks.

To improve clarity, the task type columns will use the task type colours set in System settings ‣ Workflow ‣ Types for the background colour.

In addition, all values in the Task columns, except the task type, are directly editable in the spreadsheet by double clicking the cell you would like to change.

Did this answer your question?